|
Ambrose, R.F. and K.D. Lafferty. 1996. Coastal wetland resources: Santa Barbara
County mainland. Final Report to County of Santa Barbara.
Ambrose, R.F., P.T.
Raimondi, and J.M. Engle. 1992. Final study plan for inventory of intertidal
resources in Santa Barbara County. U.S. Minerals Management Service, Pacific
OCS Region. 88p.
Ambrose, R.F., P.T.
Raimondi, J.M. Engle, and J. M. Altstatt. 1995a. Inventory of shoreline resources
in Santa Barbara County. Interim report on rocky intertidal resources. U.S.
Minerals Management Service, Pacific OCS Region. 92p. + appendices.
Ambrose, R.F., J.M.
Engle, P.T. Raimondi, M. Wilson, and J. Altstatt. 1995b. Rocky intertidal
and subtidal resources: Santa Barbara County mainland. Final Report, OCS Study
MMS 95-0067, U.S. Minerals Management Service, Pacific OCS Region. 172p.
Behrens, D.W. and
J.L. Kelly. 1986. Space and habitat resource creation in four species of intertidal
red algae. Chapter IV in Behrens, D.W. and C.O. White (eds.), Environmental
investigations at Diablo Canyon, 1985. Volume I - Marine ecological studies.
PG&E, Dept. Engr. Res. December 1986.
Bowker, R.C. 1982.
Community structure analysis - The Diablo Canyon intertidal red algae/eel
grass community. Chapter VIII in Behrens, D.W. (ed.), Environmental investigations
at Diablo Canyon, 1980. PG&E, Dept. Engr. Res. March, 1982.
Chambers Group, Inc. 2000. Santa Barbara County shoreline inventory: users
guide. Minerals Management Service.
Davis, G.E. 1982.
Channel Islands National Park biennial resources study report, October 1982.
National Park Service, U.S. Department of the Interior Report to Congress.
91p.
Davis, G.E. 1991.
Where have all the abalone gone? Pp. 22-23 in: Highlights of Natural Resources
Management 1990. NPS/NRPO/NRR-91/03. National Park Service, Washington, DC.
Davis, G.E. 1992.
Design of environmental monitoring programs. Glen Canyon and Grand Canyon
Long-term Environmental Studies Workshop Position Paper. National Research
Council, National Academy of Sciences, Washington, D.C.
Davis, G.E. 1993.
Case studies in inventory and monitoring: Channel Islands National Park, California.
Pp. 25-26 in: Proceedings of the Chena Hot Springs Workshop: Strategies for
Sustained Monitoring in Arctic and Subarctic National Park Service Units and
Reserved Areas (M. Peale, R. Kavanagh, D. Taylor, and C. Slaughter, eds.).
Natural Resources Rep. NPS/AR/NRR-93/20. National Park Service.
Davis, G.E. and W.L.
Halvorson, (editors). 1988. Inventory and monitoring of natural resources
in Channel Islands National Park, California. National Park Service. 31 p.
Davis, G.E. and W.L.
Halvorson. 1988. Channel Islands assesses ecosystem health. Pp. 21 23 in:
Highlights of Natural Resources Management 1987 (D. O'Leary, Ed.). National
Park Service Natural Resources Rept. U. S. GPO:1988 575 978. 53 pp
Davis, G.E. and H.L.
Halvorson. 1990. Applications of long-term research in U. S. National Parks:
Proceedings of a workshop to select and define case studies of natural resource
issues facing national parks. National Park Service, Ventura, California.
36 pp.
Davis, G.E., K. Faulkner,
and W.L. Halvorson. 1992. Channel Islands National Park monitoring program.
P. 8. in: Highlights of Natural Resources Management 1991. NPS/NRPO/NRR-92/07.
National Park Service, Washington, DC.
Engle, J.M. 1992.
Rocky intertidal resource monitoring at the Cabrillo National Monument, San
Diego, two months after cessation of the Point Loma Wastewater Plant undersea
pipeline sewage spill. Final Report. Water Utilities Department, San Diego.
59p.
Engle, J.M. 2000.
Rocky intertidal resource dynamics in San Diego County: Cardiff, La Jolla,
and Point Loma. Third Year Report (1999/2000). U.S. Navy, San Diego. 60p.
Engle, J.M. 2001.
Rocky intertidal resource dynamics in San Diego County: Cardiff, La Jolla,
and Point Loma. Fourth Year Report (2000/2001). U.S. Navy, San Diego. 60p.
Engle, J.M. 2002.
Rocky intertidal resource dynamics in San Diego County: Cardiff, La Jolla,
and Point Loma. Interim Five-Year Report (1997/2002). U.S. Navy, San Diego.
71p.
Engle, J.M. and D.
Farrar. 1999. Rocky intertidal resource dynamics in San Diego County: Cardiff,
La Jolla, and Point Loma. Second Year Report (1998/1999). U.S. Navy, San Diego.
59p.
Engle, J.M. and G.E.
Davis. 2000a. Ecological condition and public use of the Cabrillo National
Monument intertidal zone 1990-1995. U.S. Geological Survey, Open-File Report
00-98, Sacramento CA. 175p.
Engle, J.M. and G.E.
Davis. 2000b. Rocky intertidal resources monitoring handbook, Cabrillo National
Monument, Point Loma, San Diego, California. U.S. Geological Survey, Open-File
Report 00-202, Sacramento CA. 34p.
Engle, J.M. and G.E.
Davis. 2000c. Baseline surveys of rocky intertidal ecological resources at
Point Loma, San Diego. U.S. Geological Survey, Open-File Report 00-61, Sacramento
CA. 98p.
Engle, J.M., J.M.
Altstatt, P.T. Raimondi, and R.F. Ambrose. 1994a. Rocky intertidal monitoring
handbook for inventory of intertidal resources in Santa Barbara County. U.S.
Minerals Management Service, Pacific OCS Region. 92p.
Engle, J.M., L. Gorodezky,
K.D. Lafferty, R.F. Ambrose, and P.T. Raimondi. 1994b. First year study plan
for inventory of coastal ecological resources of the northern Channel Islands
and Ventura/Los Angeles Counties. California Coastal Commission. 31p.
Engle, J.M., K.D.
Lafferty, J.E. Dugan, D.L. Martin, N. Mode, R.F. Ambrose, and P.T. Raimondi.
1995. Second year study plan for inventory of coastal ecological resources
of the northern Channel Islands and Ventura/Los Angeles Counties. California
Coastal Commission. 46p.
Engle, J.M., R.F.
Ambrose, and P.T. Raimondi. 1997. Synopsis of the Interagency Rocky Intertidal
Monitoring Network Workshop. Final Report, OCS Study MMS 97-0012, U.S. Minerals
Management Service, Pacific OCS Region. 18p.
Engle, J.M., R.F.
Ambrose, P.T. Raimondi, S.N. Murray, M. Wilson, and S. Sapper. 1998a. Rocky
intertidal resources in San Luis Obispo, Santa Barbara, and Orange Counties.
1997 Annual Report. OCS Study, MMS 98-0011, U.S. Minerals Management Service,
Pacific OCS Region. 73p. + appendices.
Engle, J.M., D.L.
Martin, D. Hubbard, and D. Farrar. 1998b. Rocky intertidal resource dynamics
in San Diego County: Cardiff, La Jolla, and Point Loma. First Year Report
(1997/1998). U.S. Navy, San Diego. 66p.
Engle, J.M., D.L.
Martin, D. Hubbard, and D. Farrar. 1999. Rocky intertidal resource dynamics
at Point Loma, San Diego County. 1996-1998 Report. U.S. Minerals Management
Service, Pacific OCS Region. 83p.
Engle, J.M., R.F.
Ambrose, P.T. Raimondi, K.D. Lafferty, D.L. Martin, and J.M. Altstatt. In
Prep. Inventory of coastal ecological resources of the northern Channel Islands
and Ventura/Los Angeles Counties. California Coastal Commission.
Gotshall, D.W., L.L.
Laurent, S.L. Owen, J. Grant, and P. Law. 1984. A quantitative ecological
study of selected nearshore marine plants and animals at the Diablo Canyon
Power Plant site: a pre-operational baseline: 1973-1978. Calif. Dept. Fish
Game, Mar. Res. Tech. Rep. No. 48.
Gotshall D.W., J.R.R.
Ally, D.L. Vaughn, B.B. Hatfield, and P. Law. 1986. Pre-operational baseline
studies of selected nearshore marine biota at the Diablo Canyon Power Plant
site: 1979-1982. Calif. Dept. Fish Game, Mar. Res. Tech. Rep. No. 50.
Kelly, J.L. 1984.
Master species list for biological studies at Diablo Canyon. Chapter IX in
Behrens, D.W. and C.O. White (eds.), Environmental investigations at Diablo
Canyon, 1983. PG&E, Dept. Engr. Res. March, 1982.
Kelly, J.L. and D.W.
Behrens. 1981. Intertidal algal faunal associations study - a progress report.
Chapter XIII in Behrens, D.W. (ed.), Environmental investigations at Diablo
Canyon, 1979. PG&E, Dept. Engr. Res. . December 1981.
Kelly, J.L., J.W.
Warrick, and D.W. Behrens. 1985. Intertidal fish community study at Diablo
Canyon Power Plant. Chapter II in Behrens, D.W. and C.O. White (eds.), Environmental
investigations at Diablo Canyon, 1984. Volume I - Marine ecological studies.
PG&E, Dept. Engr. Res. December, 1985.
Lafferty, K.D. 2001.
Channel Islands National Park Intertidal Monitoring Program Review. January
17-19, 2001, U.S. Geological Survey Open File Report. 7p.
Meisler, M.R., J.M.
Engle, and A.E. Jahn. 1990. Los Angeles County coastal biota: inventory and
database. Los Angeles County Museum Technical Report. 136p.
Minchinton, T.E. and
P.T. Raimondi. 2001. Long-term monitoring of rocky intertidal communities
at the Channel Islands National Park: summary of spatial and temporal trends
and statistical power analyses. Scientific and management review of monitoring
protocols for Channel Islands National Park. 22p.
Murray, S.N., J.R.
Smith, J.S. Kido, J. Koehnke, and T.G. Denis. 1999. Trends in the status of
selected rocky intertidal populations in Orange County, California. Results
of a shoreline monitoring program for 1996-97 and 1997-98. Pp. 91-108 in:
Monitoring of rocky intertidal resources along the central and southern California
mainland. 3-Year Report for San Luis Obispo, Santa Barbara, and Orange Counties
(Fall 1995-Spring 1998)( Raimondi, P.T., R.F. Ambrose, J.M. Engle, S.N. Murray
and M. Wilson). OCS Study, MMS 99-0032, U.S. Minerals Management Service,
Pacific OCS Region.
Murray, S.N., E. Yee,
E. Cox, S. Frisch, A. Gerrard, J.R. Smith, S. Henkel, and J. Koehnke. 2001.
Trends in the status of selected rocky intertidal populations in Orange County,
California. Results of a shoreline monitoring program for 1996-97 through
1999-00 including unreduced data for 2000-01. U.S. Minerals Management Service,
Pacific OCS Region 26p.
Murray, S.N., E. Cox,
J. Kido, E. Yee, J. Smith, S. Frisch, S. Henkel, L. Gilbane, A. Bullard, and
A. Gerrard. 2002. Trends in the status of selected rocky intertidal populations
in Orange County, California. A progress report: 1996-97 through 2000-02.
U.S. Minerals Management Service, Pacific OCS Region 75p.
North, W.J., E.K.
Anderson, and F.A. Chapman. 1989. Wheeler J. North ecological studies at Diablo
Canyon Power Plant. Final Report, 1967-1987. Pacific Gas and Electric Company,
San Francisco, CA.
PG&E. 1983. Thermal
Effects Monitoring Program. 1982 Annual Report. Diablo Canyon Power Plant.
Pacific Gas and Electric Company, San Francisco, CA. Prepared by TERA Corp.,
Berkeley, CA. January 1983.
PG&E. 1984. Thermal
Effects Monitoring Program. 1983 Annual Report. Diablo Canyon Power Plant.
Pacific Gas and Electric Company, San Francisco, CA. Prepared by TERA Corp.,
Berkeley, CA. January 1984.
PG&E. 1985. Thermal
Effects Monitoring Program. 1984 Annual Report. Diablo Canyon Power Plant.
Pacific Gas and Electric Company, San Francisco, CA. Prepared by TERA Corp.,
Berkeley, CA. March 1985.
PG&E. 1986. Thermal
Effects Monitoring Program. 1985 Annual Report. Diablo Canyon Power Plant.
Pacific Gas and Electric Company, San Francisco, CA. Prepared by TERA Corp.,
Berkeley, CA. April 1986.
PG&E. 1987. Thermal
Effects Monitoring Program. 1986 Annual Report. Diablo Canyon Power Plant.
Pacific Gas and Electric Company, San Francisco, CA. DCL-87-087. Prepared
by TERA Corp., Berkeley, CA. May 1987.
PG&E. 1988. Thermal
Effects Monitoring Program. Final Report. Pacific Gas and Electric Company,
San Francisco, CA. DCL-88-108. Prepared by Tenera Environmental Services,
Berkeley, CA. April 1988.
PG&E. 1989. Diablo
Canyon Power Plant. Marine Environmental Monitoring Program. 1988 Annual Report.
Pacific Gas and Electric Company, San Francisco, CA. DCl-89-119. April 1989.
PG&E. 1990. Thermal
Effects Monitoring Program. 1989 Annual Report. Diablo Canyon Power Plant,
Pacific Gas and Electric Company, San Francisco, CA. Prepared by Tenera Environmental
Services, Berkeley, CA. DCL-90-111. April 1990.
PG&E. 1991. Thermal
Effects Monitoring Program. 1990 Annual Report. Diablo Canyon Power Plant,
Pacific Gas and Electric Company, San Francisco, CA. Prepared by Tenera Environmental
Services, Berkeley, CA. DCL-91-069. March 1991.
PG&E. 1992. Thermal
Effects Monitoring Program. 1991 Annual Report. Diablo Canyon Power Plant,
Pacific Gas and Electric Company, San Francisco, CA. Prepared by Tenera Environmental
Services, Berkeley, CA. DCL-92-070. March 1992.
PG&E. 1993. Thermal
Effects Monitoring Program. 1992Annual Report. Diablo Canyon Power Plant,
Pacific Gas and Electric Company, San Francisco, CA. Prepared by Tenera Environmental
Services, Berkeley, CA. DCL-93-067. March 1993.
PG&E. 1994. Thermal
Effects Monitoring Program. 1993 Annual Report. Diablo Canyon Power Plant,
Pacific Gas and Electric Company, San Francisco, CA. DCL-94-062. Prepared
by Tenera Environmental Services, Berkeley, CA. March 1994. Addendum, DCL-94-081.
PG&E. 1995. Thermal
Effects Monitoring Program. 1994 Annual Report. Diablo Canyon Power Plant,
Pacific Gas and Electric Company, San Francisco, CA. Prepared by Tenera Environmental
Services, Berkeley, CA. DCL-95-062. March 1995.
PG&E. 1996. Ecological
Monitoring Program. Summer/Fall 1995 Status Report. Diablo Canyon Power Plant.
Pacific Gas and Electric Company, San Francisco, CA. Prepared by Tenera Environmental
Services, San Francisco, CA. February 1996.
PG&E. 1996. Ecological
Monitoring Program. Status Report. Winter 1995 and Spring 1996 surveys. Pacific
Gas and Electric Company, San Francisco, CA. Prepared by Tenera Environmental
Services, San Francisco, CA. July 1996.
PG&E. 1997. Receiving
Water Monitoring Program. 1996 Semi-annual Status Report. Diablo Canyon Power
Plant. Pacific Gas and Electric Company, San Francisco, CA. Prepared by Tenera
Environmental Services, San Francisco, CA. February 1997.
Pimentel, Dr. R.A.
1981. Community structure emphasizing intertidal fishes in the vicinity of
Diablo Cove. Chapter IV in Behrens, D.W. (ed.), Environmental investigations
at Diablo Canyon, 1979. PG&E, Dept. Engr. Res. December 1981.
Pimentel, Dr. R.A.
and R.C. Bowker. 1982. Community structure involving intertidal fish in the
vicinity of Diablo Cove: Project Report, Surveys 2 - 8, May 1979 - May 1980.
Chapter VII in Behrens, D.W. (ed.), Environmental investigations at Diablo
Canyon, 1980. PG&E, Dept. Engr. Res. March, 1982.
Pimentel, R.A. and
R.C. Bowker. 1983. Intertidal community structure analysis: An evaluation
of the performance of selected subsets of Diablo Cove intertidal data analyzed
by reciprocal averaging. Chapter VIII in Behrens, D.W (ed.), Environmental
investigations at Diablo Canyon, 1982. PG&E, Dept. Engr. Res. June, 1983.
Pimentel, R.A. and
R.C. Bowker. 1984. Diablo Canyon intertidal fish study and community structure
analysis report for survey 2 through 15. Chapter XI in Behrens, D.W. and C.O.
White (eds.), Environmental investigations at Diablo Canyon, 1983. PG&E,
Dept. Engr. Res. March, 1982.
Raimondi, P.T. 1999.
1997 Torch oil spill. Pp. 34-41 in: Monitoring of rocky intertidal resources
along the central and southern California mainland. 3-Year Report for San
Luis Obispo, Santa Barbara, and Orange Counties (Fall 1995-Spring 1998)( Raimondi,
P.T., R.F. Ambrose, J.M. Engle, S.N. Murray and M. Wilson). OCS Study, MMS
99-0032, U.S. Minerals Management Service, Pacific OCS Region.
Raimondi, P.T. and
M. Wilson. 2000-2001. Progress Reports on inventory of rocky intertidal resources
in San Luis Obispo and northern Santa Barbara Counties. U.S. Minerals Management
Service, Pacific OCS Region.
Raimondi, P.T., R.F.
Ambrose, J.M. Engle, S.N. Murray, and M. Wilson. 1999. Monitoring of rocky
intertidal resources along the central and southern California mainland. 3-Year
Report for San Luis Obispo, Santa Barbara, and Orange Counties (Fall 1995-Spring
1998). OCS Study, MMS 99-0032, U.S. Minerals Management Service, Pacific OCS
Region. 142p.
Richards, D.V. 1986.
Rocky intertidal ecological monitoring in Channel Islands National Park, California
1982-1985. Channel Islands National Park and National Marine Sanctuary Natural
Science Reports CHIS-86-002. National Park Service. 26p.
Richards, D.V. 1988.
Rocky intertidal ecological monitoring in Channel Islands National Park, California
1986-1987. Channel Islands National Park Natural Science Reports CHIS-88-001.
National Park Service. 42p.
Richards, D.V. 1998.
Rocky intertidal community monitoring in Channel Islands National Park. 1997
Annual Report. Channel Islands National Park Technical Report 98-07. National
Park Service. 31p. + appendices.
Richards, D.V. and
G.E. Davis. 1988. Rocky intertidal communities monitoring handbook, Channel
Islands National Park, CA. National Park Service. 15p. + appendices.
Richards, D.V. and
D. Lerma. 2000. Rocky intertidal community monitoring in Channel Islands National
Park. 1998 Annual Report. Channel Islands National Park Technical Report 2000-03.
National Park Service. 30p. + appendices.
Richards, D.V. and
D.L. Lerma. 2002. Rocky intertidal monitoring, Channel Islands National Park,
1999 Annual Report. Technical Report CHIS-2002-03. National Park Service.
Rivas, O.O., J.R.
Smith, J.S. Kido, and S.N. Murray. 1997. Evaluation of the use of qualitative
video samples for detecting changes in the abundances of selected rocky intertidal
populations. Minerals Management Service, Pacific OCS Region. 43p.
Steinbeck, J.R. 1987.
A numerical analysis of the intertidal algal community of Diablo Cove, California.
Chapter IV in Behrens, D.W. and White, C.O. (eds.), Environmental investigations
at Diablo Canyon, 1986. Volume I - Marine ecological studies. PG&E, Dept.
Engr. Res. December 1987.
Tenera, Inc. 1997.
Diablo Canyon Power Plant Thermal Effects Monitoring Program Analysis Report.
Chapter 1. Changes in the marine environment resulting from the Diablo Canyon
Power Plant thermal discharge. Prepared for Pacific Gas and Electric Company,
San Francisco, CA. December 1997.
Tenera, Inc. Diablo
Canyon Power Plant. Receiving Water Monitoring Program. 1998 Winter-Spring
Report. Prepared for Pacific Gas and Electric Company, San Francisco, CA.
July 1998.
Tenera, Inc. 1998.
Diablo Canyon Power Plant. Receiving Water Monitoring Program. 1995-1997 Progress
Report. Prepared for Pacific Gas and Electric Company, San Francisco, CA.
August 1998.
Tenera Environmental.
1998. Surfgrass (Phyllospadix) in the Vicinity of the Diablo Canyon Power
Plant Discharge. E7-225.4. Prepared for Pacific Gas and Electric Company,
San Francisco, CA.
Tenera Environmental.
1998. Comprehensive Evaluation of the Diablo Canyon Power Plant. Receiving
Water Monitoring Program. E8-009.2. Prepared for Pacific Gas & Electric
Company, San Francisco, CA.
Tenera Environmental.
1998. Diablo Canyon Power Plant Thermal Effects Monitoring Program Analysis
Report. Chapter 2 - Assessment of Thermal Effects. Prepared for Pacific Gas
& Electric.
Tenera Environmental.
1999. Diablo Canyon Power Plant Receiving Water Monitoring Program: 1995-1998
Progress Report. Prepared for Pacific Gas & Electric.
Tenera Environmental.
2000. Diablo Canyon Power Plant Receiving Water Monitoring Program: 1999 Annual
Report. Prepared for Pacific Gas & Electric.
Tenera Environmental.
2001. Diablo Canyon Power Plant Receiving Water Monitoring Program: 2000 Annual
Report. Prepared for Pacific Gas & Electric.
Tenera Environmental.
2002. Diablo Canyon Power Plant Receiving Water Monitoring Program: 2001 Annual
Report. Prepared for Pacific Gas & Electric.
Tenera Environmental.
2002. Diablo Canyon Power Plant Receiving Water Monitoring Program: 1995 -
2002 Analysis Report. Prepared for Pacific Gas & Electric.
TERA Corp. 1981. Life
history and ecology of 21 central California nearshore marine species. Prepared
for Pacific Gas and Electric Company. 204 pp.
Tissot, B.N. and J.R.
Steinbeck. 1983. A study of microgeographic variation in Collisella digitalis
in Diablo Cove, California. Chapter IX in Behrens, D.W (ed.), Environmental
investigations at Diablo Canyon, 1982. PG&E, Dept. Engr. Res. June, 1983.
VTN Oregon, Inc. 1983. Visitor impact and recovery on Channel Islands tide
pools: final report. Contract No. CX 8000-1-0054. National Park Service.
|